A turnkey project managed by Deep Living London for the construction of a 100,000ft2 self storage facility, with 34Nr Artist studios. Works began in September 2023 and reached completion in January 2025, with a total project value of £13.1m. As a trusted provider of contracting services, Deep Living London has been pivotal in facilitating the development and construction phases across this site.
Using the Deep Group Internal Companies to undertake Groundworks, Steelwork, Scaffolding and Blockwork, our team delivered a fully operational prestigious self-storage facility.
Deep Steelwork’s contribution to the project was vital for providing the structural framework that supports the entire self-storage building. The company’s expertise in steel fabrication and installation ensured a high-quality finish, while addressing the project’s need for speed and precision.
Project Scope
- Structural Steelwork: Deep Steelwork was responsible for the fabrication and installation of the building’s structural steel framework, which was 450 tonnes in size. This involved the careful erection of steel beams and columns to create the skeletal structure of the building, which would support both the upper floors and roof. The project’s complexity required precise measurements and coordination with the other divisions to ensure that the steelwork integrated seamlessly with other building components. Deep Steelwork provided all Craneage and Access equipment to conduct the installation.
- Floor Decking and Roof Decking: The installation of floor and roof decking followed the steel framework. Deep Steelwork’s team installed robust decking materials, which provided the foundation for both the upper floors and the roof of the building. These decks are crucial for supporting the weight of the building’s contents and ensuring stability, while also allowing for smooth operations once the storage facility is fully functional.
- Intumescent Paint: To ensure the fire safety of the building, Deep Steelwork applied intumescent paint to the structural steel components to 90 minutes fire rating. This paint acts as a fire retardant, expanding when exposed to high temperatures and creating a protective barrier that enhances the fire resistance of the steel structure. This treatment played a critical role in meeting stringent building regulations and ensuring the safety of both the building and its occupants.