Newman St

SFS, Brickwork, Blockwork & Scaffold

Newman Street Hotel, London

Deep Contractors successfully secured the tender for the SFS, scaffolding, hoists, brickwork, and blockwork packages at the Newman Street Hotel project in Central London.

Project Challenges

Located just off a busy main road, the site presented significant logistical challenges. Restricted access and limited storage space required careful planning and coordination throughout the project to ensure works progressed efficiently without disruption.

Innovative Blockwork Design

All blockwork was designed and installed with no visible lintel heads, creating the appearance of floating blockwork within the basement levels. This innovative approach delivered a clean, modern aesthetic where the blockwork walls were left exposed, eliminating the need for additional surface finishes while maintaining a high-quality visual impact.

Brickwork, Scaffold & Logistics Management

The brickwork and scaffolding packages introduced further complexities, particularly in managing interfaces with stonework and adapting to the continually reducing on-site storage space. To overcome these constraints, just-in-time deliveries were essential and meticulously managed to maintain program and quality standards.

Client Satisfaction & Future Opportunities

The client was extremely pleased with both the façade finish and the internal blockwork quality. As a result of this success, Deep Contractors are now in discussions to secure multiple new projects with the same client, reinforcing the strength of the relationship and confidence in our delivery capabilities.

Services provided

Blockwork, Brickwork, Scaffolding, SFS

Main Contractor

FM Construction and Maintenance Limited

Location

London