Ealing Filmworks

Steelwork
780t Structural steelwork frame, arriving to site c/w offsite applied 60min Intumescent paint, all steelwork arrived on site pre-slung with positive lifting shackles and strops attached to avoid the requirement for erectors boarding lorry bed, over 3500 LM of cold rolled roof and parapet purlins, 4800m2 150mm metal decking, 37t of rebar and 4800m2 of C35 concrete.

Services provided

Steelwork

Main Contractor

St George

Location

Ealing,
London